IEEP Double Insulated Pipework

ieep_pipework

IEEP Double Insulated Pipework is subject to strict engineering guidelines and manufacturing quality control to ensure longevity performance in harsh mining conditions, as well as ensuring that there are no adverse affects to the performance of the machine.

 

The Double Insulated Pipework offers many benefits to the client and to the overall operation of the machine which include:

  • Increased safety for Maintenance Personnel
  • No thermal blankets required to cover the pipework
  • Reduced over all engine bay temperature
  • Reduced potential fire risk

ieep_pipework

IEEP Centre of Operations: 3 Rosella Street, McDougalls Hill, NSW Australia, 2330. Tel: 1300 790 414. Email: sales@minetek.com

Privacy Policy  Read it here